Triple

T10936455
Position Surface form Disambiguated ID Type / Status
Subject PWM E258344 entity
Predicate IATA code P2569 FINISHED
Object PWM E258344 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PWM | Statement: [PWM, IATA code, PWM]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PWM
Context triple: [PWM, IATA code, PWM]
  • A. PWM chosen
    PWM is the three-letter IATA airport code for Portland International Jetport in Portland, Maine, USA.
  • B. KPWM
    KPWM is the ICAO airport code for Portland International Jetport in Portland, Maine, a primary commercial airport serving the region.
  • C. P Control
    "P Control" is a funk-infused song by Prince that opens his 1995 album *The Gold Experience* and is known for its explicit, empowering lyrics about female independence and sexuality.
  • D. POWER1
    POWER1 is IBM’s first-generation 32-bit RISC microprocessor architecture used in early RS/6000 workstations and servers.
  • E. SPI
    SPI (Serial Peripheral Interface) is a synchronous serial communication protocol commonly used in embedded systems to connect microcontrollers with peripherals such as sensors, memory, and displays.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8769b4819082bfe5e61b9017f0 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d770afaa1c8190b8fced9c694c0938 completed April 9, 2026, 9:26 a.m.
NED1 Entity disambiguation (via context triple) batch_69e23bfd6a108190a0557598f68659fa completed April 17, 2026, 1:56 p.m.
Created at: April 8, 2026, 9:23 p.m.