Triple
T10936316
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GWS30 Sea Dart |
E258340
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | guided missile system |
C17786
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: guided missile system Context triple: [GWS30 Sea Dart, instanceOf, guided missile system]
-
A.
radar-guided missile
A radar-guided missile is a self-propelled weapon that uses onboard or external radar signals to detect, track, and home in on a target during flight.
-
B.
laser-guided munition
A laser-guided munition is a precision weapon that homes in on a target illuminated by a laser designator, adjusting its flight path in real time to accurately strike the designated point.
-
C.
self-propelled surface-to-air missile system
chosen
A self-propelled surface-to-air missile system is a mobile, ground-based weapons platform that integrates its own propulsion, radar, and missile launch capabilities to detect, track, and engage airborne targets.
-
D.
anti-armor missile
An anti-armor missile is a guided munition designed specifically to detect, track, and destroy armored targets such as tanks and armored vehicles using high-penetration warheads.
-
E.
cruise missile
A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8769b4819082bfe5e61b9017f0 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:23 p.m.