Triple

T10923352
Position Surface form Disambiguated ID Type / Status
Subject Collective Rapid Deployment Forces in Central Asia E258001 entity
Predicate instanceOf P0 FINISHED
Object CSTO military contingent C2497 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CSTO military contingent
Context triple: [Collective Rapid Deployment Forces in Central Asia, instanceOf, CSTO military contingent]
  • A. Laotian military personnel
    Laotian military personnel are individuals who serve in the armed forces of Laos, responsible for national defense, internal security, and supporting government operations.
  • B. Guards field army
    The Guards field army is an elite, front-line military formation composed of highly trained and well-equipped units tasked with executing critical offensive and defensive operations on behalf of a state or empire.
  • C. Soviet field army
    A Soviet field army was a large, operational-level military formation of the Soviet Armed Forces, typically comprising multiple corps or divisions, support units, and command structures, organized to conduct sustained offensive or defensive campaigns in a designated theater of operations.
  • D. military unit chosen
    A military unit is an organized group of armed personnel structured under a defined command hierarchy to perform specific tactical or operational missions.
  • E. NATO rapid reaction corps headquarters
    The NATO Rapid Reaction Corps Headquarters is a high-readiness, multinational command element responsible for planning, coordinating, and directing rapid deployment and operations of NATO land forces in crisis or conflict.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa864ed88190818280ab6791d065 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:22 p.m.