Triple

T10913369
Position Surface form Disambiguated ID Type / Status
Subject Jasper County, South Carolina E257755 entity
Predicate hasMajorHighway P385 FINISHED
Object U.S. Route 17 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 17 | Statement: [Jasper County, South Carolina, hasMajorHighway, U.S. Route 17]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 17
Context triple: [Jasper County, South Carolina, hasMajorHighway, U.S. Route 17]
  • A. U.S. Route 17 chosen
    U.S. Route 17 is a major north–south U.S. Highway running along the southeastern Atlantic coast, connecting cities from Florida to Virginia.
  • B. U.S. Route 19
    U.S. Route 19 is a major north–south United States highway running from Erie, Pennsylvania, to Memphis, Florida, passing through several states in the eastern U.S.
  • C. U.S. Route 11
    U.S. Route 11 is a major north–south U.S. Highway running through the eastern United States, connecting numerous cities and regions from Louisiana to New York.
  • D. U.S. Route 177
    U.S. Route 177 is a north–south United States highway running through parts of Oklahoma and Kansas, connecting several small towns and regional routes.
  • E. U.S. Route 14
    U.S. Route 14 is a major east–west U.S. Highway that runs from Chicago, Illinois, across the northern Midwest and Great Plains to Yellowstone National Park in Wyoming.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa864ed88190818280ab6791d065 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d7707310b0819092d0140acc3c64ba completed April 9, 2026, 9:25 a.m.
Created at: April 8, 2026, 9:22 p.m.