Triple

T10904297
Position Surface form Disambiguated ID Type / Status
Subject Brighton Racecourse E257526 entity
Predicate hasFinishType P65191 FINISHED
Object uphill finish LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: uphill finish | Statement: [Brighton Racecourse, hasFinishType, uphill finish]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasFinishType
Context triple: [Brighton Racecourse, hasFinishType, uphill finish]
  • A. hasTypicalFinish
    Indicates that one entity characteristically or commonly concludes, completes, or ends with another entity.
  • B. finishType chosen
    Indicates the manner or outcome by which an action, process, or event is completed.
  • C. hasSprintFinish
    Indicates that an event, activity, or process concludes with a short, intense final effort or burst of speed.
  • D. hasFrameFinish
    Indicates that an entity’s frame possesses a specific surface treatment or finish.
  • E. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8550c8819095508a2ed9acf3db completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d761a5dffc8190927b0928978646a4 completed April 9, 2026, 8:21 a.m.
PD Predicate disambiguation batch_69d70d3d69e08190bb369e9a7927142c completed April 9, 2026, 2:21 a.m.
Created at: April 8, 2026, 9:22 p.m.