Triple

T10902838
Position Surface form Disambiguated ID Type / Status
Subject Corunna, Ontario E257488 entity
Predicate locatedAlong P2409 FINISHED
Object Highway 40 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Highway 40 | Statement: [Corunna, Ontario, locatedAlong, Highway 40]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Highway 40
Context triple: [Corunna, Ontario, locatedAlong, Highway 40]
  • A. Highway 40 chosen
    Highway 40 is a regional roadway in Ontario, Canada, that serves as a key transportation route through the municipality of Chatham-Kent.
  • B. Highway 70
    Highway 70 is a major north–south roadway in northern Israel that connects several key cities and junctions in the region.
  • C. National Highway 48
    National Highway 48 is a major Indian roadway that forms part of the primary north–south transport corridor, linking key cities such as Delhi, Jaipur, Ahmedabad, Mumbai, and Bengaluru.
  • D. U.S. Route 50
    U.S. Route 50 is a major transcontinental U.S. highway running east–west across the country from the Atlantic coast in Maryland to California, passing through numerous states and key cities along the way.
  • E. Highway 89
    Highway 89 is a major north–south U.S. route in the western United States known for its scenic stretches through national parks and natural landmarks.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8550c8819095508a2ed9acf3db completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d761a4e9d48190b107839761a2152b completed April 9, 2026, 8:21 a.m.
Created at: April 8, 2026, 9:22 p.m.