Triple

T10898554
Position Surface form Disambiguated ID Type / Status
Subject Kennedy Mine E257372 entity
Predicate shutdownCause P77548 FINISHED
Object World War II gold mining shutdown order LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: World War II gold mining shutdown order | Statement: [Kennedy Mine, shutdownCause, World War II gold mining shutdown order]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: shutdownCause
Context triple: [Kennedy Mine, shutdownCause, World War II gold mining shutdown order]
  • A. failureCause chosen
    Indicates that one event, condition, or factor is the reason or source that caused a particular failure to occur.
  • B. shutdownCapability
    Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
  • C. fallCause
    Indicates that one event or condition causes or brings about another event of falling or decline.
  • D. permanentShutdown
    Indicates that an entity has been irreversibly taken out of operation and will not be restarted or resumed in the future.
  • E. shutdownPeriod
    Indicates a time interval during which a system, service, or process is intentionally turned off or not operational.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8550c8819095508a2ed9acf3db completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d75d03a3fc81908df039b9b5ab9ca2 completed April 9, 2026, 8:02 a.m.
PD Predicate disambiguation batch_69d70d3d69e08190bb369e9a7927142c completed April 9, 2026, 2:21 a.m.
Created at: April 8, 2026, 9:21 p.m.