Triple

T10897498
Position Surface form Disambiguated ID Type / Status
Subject Hubble Space Telescope Servicing Mission 3A E257347 entity
Predicate installedComponent P96295 FINISHED
Object Hubble Space Telescope voltage/temperature improvement kit LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hubble Space Telescope voltage/temperature improvement kit | Statement: [Hubble Space Telescope Servicing Mission 3A, installedComponent, Hubble Space Telescope voltage/temperature improvement kit]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: installedComponent
Context triple: [Hubble Space Telescope Servicing Mission 3A, installedComponent, Hubble Space Telescope voltage/temperature improvement kit]
  • A. installedInstrument
    Indicates that one entity has placed or set up another entity as an instrument or device for use in a particular context or system.
  • B. installedBy
    Indicates that one entity was set up, put in place, or made operational through the actions or intervention of another entity.
  • C. installationCompleted
    Indicates that the process of installing something has finished successfully.
  • D. installedAt
    Indicates that something has been set up, placed, or put into operation at a specific location or site.
  • E. installedPower
    Indicates the total nominal power capacity that has been set up or equipped for use in a system, device, or facility.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8550c8819095508a2ed9acf3db completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d75d02e4c88190b8286078e90bf913 completed April 9, 2026, 8:02 a.m.
PD Predicate disambiguation batch_69d70d3943c881908895397eccc3e415 completed April 9, 2026, 2:21 a.m.
PDg Predicate description generation batch_69d7101de31c819090707635f6790559 completed April 9, 2026, 2:34 a.m.
Created at: April 8, 2026, 9:21 p.m.