Triple

T10891736
Position Surface form Disambiguated ID Type / Status
Subject CERN data centre E257193 entity
Predicate instanceOf P0 FINISHED
Object data centre C14787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: data centre
Context triple: [CERN data centre, instanceOf, data centre]
  • A. data center chosen
    A data center is a specialized facility that houses networked computer systems, storage, and infrastructure to process, manage, and store large volumes of digital data.
  • B. data center platform
    A data center platform is an integrated environment of hardware, software, and management tools that provides scalable, secure, and reliable infrastructure for hosting, processing, and managing data and applications.
  • C. data center network
    A data center network is a specialized, high-performance communication infrastructure that interconnects servers, storage systems, and networking devices within and between data centers to enable efficient, reliable data exchange and application delivery.
  • D. data center management solution
    A data center management solution is a comprehensive software platform that monitors, controls, and optimizes the physical and virtual resources, infrastructure, and operations within a data center to ensure efficiency, reliability, and scalability.
  • E. data center infrastructure management platform
    A data center infrastructure management platform is a centralized software system that monitors, analyzes, and optimizes the physical and virtual resources, power, cooling, and capacity of data centers to improve efficiency, reliability, and planning.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8550c8819095508a2ed9acf3db completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:21 p.m.