Triple

T10885867
Position Surface form Disambiguated ID Type / Status
Subject Autoroute A10 E257042 entity
Predicate hasJunctionWith P1018 FINISHED
Object A85
A85 is a French autoroute that serves as a major east–west motorway linking the A11 near Angers to the A71 near Vierzon, facilitating regional and long-distance traffic across central France.
E890594 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A85 | Statement: [Autoroute A10, hasJunctionWith, A85]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A85
Context triple: [Autoroute A10, hasJunctionWith, A85]
  • A. A858
    A858 is a main road on the Isle of Lewis in Scotland that connects the town of Stornoway with several communities around the island’s west side.
  • B. A859
    The A859 is a main road on the Isle of Lewis in Scotland that links the town of Stornoway with communities to the south.
  • C. A89
    The A89 is a major road in Scotland that connects Edinburgh and Glasgow, passing through various towns and serving as an important regional transport route.
  • D. A86
    A86 is a major orbital motorway forming part of the ring road system around Paris, France.
  • E. A80
    The A80 is a major road in Scotland that historically served as a key route between Glasgow and Stirling before being largely replaced by the M80 motorway.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A85
Triple: [Autoroute A10, hasJunctionWith, A85]
Generated description
A85 is a French autoroute that serves as a major east–west motorway linking the A11 near Angers to the A71 near Vierzon, facilitating regional and long-distance traffic across central France.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A85
Target entity description: A85 is a French autoroute that serves as a major east–west motorway linking the A11 near Angers to the A71 near Vierzon, facilitating regional and long-distance traffic across central France.
  • A. A858
    A858 is a main road on the Isle of Lewis in Scotland that connects the town of Stornoway with several communities around the island’s west side.
  • B. A859
    The A859 is a main road on the Isle of Lewis in Scotland that links the town of Stornoway with communities to the south.
  • C. A89
    The A89 is a major road in Scotland that connects Edinburgh and Glasgow, passing through various towns and serving as an important regional transport route.
  • D. A86
    A86 is a major orbital motorway forming part of the ring road system around Paris, France.
  • E. A80
    The A80 is a major road in Scotland that historically served as a key route between Glasgow and Stirling before being largely replaced by the M80 motorway.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa848804819081b2713ca0bedf06 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d751dd6a3c81909965ef774e8b7309 completed April 9, 2026, 7:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69dff7ecf1c48190aef0d31ef03d1f88 completed April 15, 2026, 8:41 p.m.
NEDg Description generation batch_69e002709d38819099c4402d30824612 completed April 15, 2026, 9:26 p.m.
NED2 Entity disambiguation (via description) batch_69e005873ba48190b8c24c77611562fa completed April 15, 2026, 9:39 p.m.
Created at: April 8, 2026, 9:21 p.m.