Triple
T10879336
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | General Staff Building, Arbat Square, Moscow |
E256880
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Soviet-era building |
C14533
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Soviet-era building Context triple: [General Staff Building, Arbat Square, Moscow, instanceOf, Soviet-era building]
-
A.
Stalinist skyscraper
A Stalinist skyscraper is a monumental high-rise building characterized by grandiose, neoclassical-inspired forms, heavy ornamentation, and a propagandistic expression of Soviet power and ideology.
-
B.
socialist realist urban complex
chosen
A socialist realist urban complex is a planned architectural and spatial ensemble that embodies socialist ideology through monumental, functional buildings, broad avenues, and integrated public spaces designed to promote collective life and state power.
-
C.
Streamline Moderne building
A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
-
D.
Bauhaus building
A Bauhaus building is a structure designed in the early 20th-century Bauhaus style, characterized by functional forms, clean lines, flat roofs, and an emphasis on simplicity, industrial materials, and the integration of art, craft, and technology.
-
E.
Georgian building
A Georgian building is a structure designed in the architectural style prevalent from the early 18th to early 19th centuries, characterized by symmetry, proportion, and classical details such as sash windows, decorative cornices, and brick or stone facades.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa848804819081b2713ca0bedf06 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:21 p.m.