Triple

T10879336
Position Surface form Disambiguated ID Type / Status
Subject General Staff Building, Arbat Square, Moscow E256880 entity
Predicate instanceOf P0 FINISHED
Object Soviet-era building C14533 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Soviet-era building
Context triple: [General Staff Building, Arbat Square, Moscow, instanceOf, Soviet-era building]
  • A. Stalinist skyscraper
    A Stalinist skyscraper is a monumental high-rise building characterized by grandiose, neoclassical-inspired forms, heavy ornamentation, and a propagandistic expression of Soviet power and ideology.
  • B. socialist realist urban complex chosen
    A socialist realist urban complex is a planned architectural and spatial ensemble that embodies socialist ideology through monumental, functional buildings, broad avenues, and integrated public spaces designed to promote collective life and state power.
  • C. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • D. Bauhaus building
    A Bauhaus building is a structure designed in the early 20th-century Bauhaus style, characterized by functional forms, clean lines, flat roofs, and an emphasis on simplicity, industrial materials, and the integration of art, craft, and technology.
  • E. Georgian building
    A Georgian building is a structure designed in the architectural style prevalent from the early 18th to early 19th centuries, characterized by symmetry, proportion, and classical details such as sash windows, decorative cornices, and brick or stone facades.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa848804819081b2713ca0bedf06 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:21 p.m.