Triple
T10851394
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jiangnan Arsenal |
E256153
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | weapons factory |
C6155
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: weapons factory Context triple: [Jiangnan Arsenal, instanceOf, weapons factory]
-
A.
tank factory
A tank factory is an industrial facility where armored combat vehicles are designed, manufactured, assembled, and tested before deployment.
-
B.
weapons testing facility
A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
-
C.
arms manufacturer
chosen
An arms manufacturer is a company or entity that designs, produces, and supplies weapons, ammunition, and related military equipment for use by armed forces, security agencies, or private clients.
-
D.
nuclear weapons production facility
A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
-
E.
weapons engineer
A weapons engineer is a specialist who designs, develops, tests, and improves weapon systems and related defense technologies while balancing performance, safety, and regulatory constraints.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa81a5d08190aa86689061d1ddd2 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:20 p.m.