Triple
T10832334
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Severn River Basin District |
E255653
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river basin district |
C28860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river basin district Context triple: [Severn River Basin District, instanceOf, river basin district]
-
A.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
B.
river basin organization
A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
-
C.
drainage basin
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
-
D.
watershed
A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
-
E.
river border area
A river border area is a geographic zone where a river serves as a natural boundary between adjacent political or administrative regions, encompassing the waterway and its immediate banks.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8081448190a9324184f2bd1c26 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:19 p.m.