Triple

T10820542
Position Surface form Disambiguated ID Type / Status
Subject Clark Fork River and Bitterroot River E255357 entity
Predicate instanceOf P0 FINISHED
Object ecological feature C28839 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ecological feature
Context triple: [Clark Fork River and Bitterroot River, instanceOf, ecological feature]
  • A. ecological concept
    An ecological concept is an abstract idea or principle that explains relationships, processes, and patterns within ecosystems and between organisms and their environment.
  • B. ecological corridor
    An ecological corridor is a natural or restored habitat pathway that connects separate wildlife populations, enabling species movement, gene flow, and ecosystem resilience across fragmented landscapes.
  • C. ecosystem
    An ecosystem is a dynamic community of living organisms interacting with each other and with their physical environment as a functional unit.
  • D. ecogeographical rule
    An ecogeographical rule is a principle that describes consistent patterns in the variation of species’ traits (such as body size, shape, or coloration) along environmental gradients like latitude, altitude, or climate.
  • E. biological characteristic
    A biological characteristic is an inherent or acquired feature of a living organism, such as its structure, function, or behavior, that distinguishes it from others.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8081448190a9324184f2bd1c26 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:18 p.m.