Triple
T10820248
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Texas and Pacific Station (Fort Worth) |
E255347
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railroad terminal |
C10600
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railroad terminal Context triple: [Texas and Pacific Station (Fort Worth), instanceOf, railroad terminal]
-
A.
railroad depot
A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
-
B.
passenger rail terminal
A passenger rail terminal is a dedicated facility where travelers board, disembark, and transfer between trains, supported by platforms, ticketing, waiting areas, and related passenger services.
-
C.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
-
D.
terminal station
chosen
A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
-
E.
group of passenger rail terminals
A group of passenger rail terminals is a collection of interconnected or related railway stations designed for boarding, alighting, and transferring passengers within a coordinated transport network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8081448190a9324184f2bd1c26 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:18 p.m.