Triple
T10815564
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lane Southern Orchards |
E255219
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roadside market |
C405
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roadside market Context triple: [Lane Southern Orchards, instanceOf, roadside market]
-
A.
waterfront market
A waterfront market is a lively commercial area located along a body of water where vendors sell goods, food, and services, often blending local culture, tourism, and scenic views.
-
B.
shopping street
chosen
A shopping street is a public thoroughfare lined with a variety of retail stores, services, and eateries designed for pedestrian access and commercial activity.
-
C.
roadside community
A roadside community is a small settlement or cluster of services that develops along a roadway to support travelers and nearby residents with amenities such as fuel, food, lodging, and basic commerce.
-
D.
indoor market
An indoor market is a covered commercial space where multiple vendors sell a variety of goods—such as food, crafts, and household items—to the public in a shared environment.
-
E.
roadside attraction
A roadside attraction is a visually striking or unusual site or installation located along travel routes, designed to entice passing motorists to stop, visit, and often spend money.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8081448190a9324184f2bd1c26 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:18 p.m.