Triple

T10796448
Position Surface form Disambiguated ID Type / Status
Subject RIM-116 RAM E254719 entity
Predicate instanceOf P0 FINISHED
Object naval short-range air defense system C26997 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval short-range air defense system
Context triple: [RIM-116 RAM, instanceOf, naval short-range air defense system]
  • A. coastal defense missile system
    A coastal defense missile system is a land-based military installation designed to detect, track, and engage hostile naval targets approaching a nation's shoreline using guided missiles and integrated sensor networks.
  • B. naval defense system chosen
    A naval defense system is an integrated network of sensors, weapons, platforms, and command-and-control components designed to detect, deter, and neutralize maritime threats to ships, fleets, and coastal assets.
  • C. integrated air defence system
    An integrated air defence system is a coordinated network of sensors, command and control elements, and weapon systems designed to detect, track, and engage aerial threats to protect designated airspace and assets.
  • D. self-propelled surface-to-air missile system
    A self-propelled surface-to-air missile system is a mobile, ground-based weapons platform that integrates its own propulsion, radar, and missile launch capabilities to detect, track, and engage airborne targets.
  • E. air and missile defense interceptor
    An air and missile defense interceptor is a guided weapon system designed to detect, track, and destroy incoming aircraft, cruise missiles, or ballistic missiles before they reach their targets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa61c15c8190a1839550c56e75e1 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:17 p.m.