Triple
T1076435
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Industrial Security Program |
E23849
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | security program |
C5308
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: security program Context triple: [National Industrial Security Program, instanceOf, security program]
-
A.
network security protocol
A network security protocol is a defined set of rules and procedures that protect data integrity, confidentiality, and authenticity during communication between devices over a network.
-
B.
software
Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
-
C.
cryptographic protocol
A cryptographic protocol is a precisely defined sequence of operations and message exchanges that uses cryptographic primitives to achieve security goals such as confidentiality, integrity, authentication, and non-repudiation between parties.
-
D.
software engineering certification
A software engineering certification is a formal credential that validates an individual's knowledge, skills, and competence in applying software engineering principles, practices, and tools to professional development projects.
-
E.
program
A program is a structured set of instructions written in a programming language that a computer can execute to perform specific tasks or solve problems.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493f1ddf48190a99d54b00e99f8ce |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:42 p.m.