Triple

T10761255
Position Surface form Disambiguated ID Type / Status
Subject Cape to Cairo Railway project E253831 entity
Predicate instanceOf P0 FINISHED
Object proposed railway line C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed railway line
Context triple: [Cape to Cairo Railway project, instanceOf, proposed railway line]
  • A. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • C. railway route
    A railway route is a defined path or corridor along which trains operate between specified locations, following designated tracks, schedules, and operational rules.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5f54f4819082d0bbcb6f8797e6 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:16 p.m.