Triple

T10756898
Position Surface form Disambiguated ID Type / Status
Subject triple-alpha process E253718 entity
Predicate operatesAfter P92987 FINISHED
Object hydrogen-burning phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hydrogen-burning phase | Statement: [triple-alpha process, operatesAfter, hydrogen-burning phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatesAfter
Context triple: [triple-alpha process, operatesAfter, hydrogen-burning phase]
  • A. operatedAfter chosen
    Indicates that one operation or action occurred later in time than another specified operation or action.
  • B. operatesOver
    Indicates that one entity performs actions or exerts functional control across, upon, or throughout another entity or domain.
  • C. operatedBefore
    Indicates that one entity performed an operation or action at an earlier time than another entity.
  • D. operatedBehind
    Indicates that one entity performed an operation or action while being physically or figuratively positioned at the rear or out of direct view of another entity.
  • E. operatesBy
    Indicates that an entity performs its function, action, or process through the use or application of another entity (e.g., a method, mechanism, or principle).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5f54f4819082d0bbcb6f8797e6 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d72e9fded88190940df48344fc368e completed April 9, 2026, 4:44 a.m.
PD Predicate disambiguation batch_69d6f311529c819080ca5493d55d6050 completed April 9, 2026, 12:30 a.m.
Created at: April 8, 2026, 9:15 p.m.