Triple

T10750680
Position Surface form Disambiguated ID Type / Status
Subject Lower Subansiri Hydroelectric Project E253562 entity
Predicate regulator P46 FINISHED
Object Central Electricity Authority of India
The Central Electricity Authority of India is a statutory government body responsible for technical and economic regulation, planning, and development of the country’s power sector.
E884000 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Electricity Authority of India | Statement: [Lower Subansiri Hydroelectric Project, regulator, Central Electricity Authority of India]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Electricity Authority of India
Context triple: [Lower Subansiri Hydroelectric Project, regulator, Central Electricity Authority of India]
  • A. Maharashtra State Electricity Board
    Maharashtra State Electricity Board is a former state-owned utility responsible for electricity generation, transmission, and distribution across the Indian state of Maharashtra.
  • B. Karnataka Power Corporation Limited
    Karnataka Power Corporation Limited is a state-owned enterprise responsible for generating and supplying electricity in the Indian state of Karnataka through a portfolio of thermal, hydroelectric, and renewable power projects.
  • C. NTPC Limited
    NTPC Limited is India’s largest state-owned power generation company, primarily engaged in producing and selling electricity from coal, gas, hydro, and renewable sources across the country.
  • D. Andhra Pradesh Power Generation Corporation
    Andhra Pradesh Power Generation Corporation is a state-owned power utility responsible for electricity generation and operation of major power plants in the Indian state of Andhra Pradesh.
  • E. NHPC Limited
    NHPC Limited is an Indian government-owned hydropower company that develops, operates, and maintains large hydroelectric projects across the country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Central Electricity Authority of India
Triple: [Lower Subansiri Hydroelectric Project, regulator, Central Electricity Authority of India]
Generated description
The Central Electricity Authority of India is a statutory government body responsible for technical and economic regulation, planning, and development of the country’s power sector.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Central Electricity Authority of India
Target entity description: The Central Electricity Authority of India is a statutory government body responsible for technical and economic regulation, planning, and development of the country’s power sector.
  • A. Maharashtra State Electricity Board
    Maharashtra State Electricity Board is a former state-owned utility responsible for electricity generation, transmission, and distribution across the Indian state of Maharashtra.
  • B. Karnataka Power Corporation Limited
    Karnataka Power Corporation Limited is a state-owned enterprise responsible for generating and supplying electricity in the Indian state of Karnataka through a portfolio of thermal, hydroelectric, and renewable power projects.
  • C. NTPC Limited
    NTPC Limited is India’s largest state-owned power generation company, primarily engaged in producing and selling electricity from coal, gas, hydro, and renewable sources across the country.
  • D. Andhra Pradesh Power Generation Corporation
    Andhra Pradesh Power Generation Corporation is a state-owned power utility responsible for electricity generation and operation of major power plants in the Indian state of Andhra Pradesh.
  • E. NHPC Limited
    NHPC Limited is an Indian government-owned hydropower company that develops, operates, and maintains large hydroelectric projects across the country.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5e51e8819095f06881cecf152e completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d71dbfe5f481908eed42328447b158 completed April 9, 2026, 3:32 a.m.
NED1 Entity disambiguation (via context triple) batch_69de23292f8c8190a52c94c03e7d476d completed April 14, 2026, 11:21 a.m.
NEDg Description generation batch_69de271e2698819093bba748a0a0db5d completed April 14, 2026, 11:38 a.m.
NED2 Entity disambiguation (via description) batch_69de2cdd79608190bad8045939556bc7 completed April 14, 2026, 12:02 p.m.
Created at: April 8, 2026, 9:15 p.m.