Triple

T10749447
Position Surface form Disambiguated ID Type / Status
Subject Trawsfynydd nuclear power station E253534 entity
Predicate thermalCapacityPerReactor_MWth P95775 FINISHED
Object 550 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 550 | Statement: [Trawsfynydd nuclear power station, thermalCapacityPerReactor_MWth, 550]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: thermalCapacityPerReactor_MWth
Context triple: [Trawsfynydd nuclear power station, thermalCapacityPerReactor_MWth, 550]
  • A. thermalPower
    Indicates the amount of heat energy per unit time that a system, device, or process generates, transfers, or consumes.
  • B. thermalNeutronReactor
    Indicates that the subject is a nuclear reactor that operates using thermal (low-energy) neutrons to sustain its fission chain reaction.
  • C. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • E. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5e51e8819095f06881cecf152e completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d71dbecd58819081e859ebf72f656c completed April 9, 2026, 3:32 a.m.
PD Predicate disambiguation batch_69d6f30df9948190ab3cdc33977fac14 completed April 9, 2026, 12:30 a.m.
PDg Predicate description generation batch_69d6fa323564819097b207eb53f8a9b8 completed April 9, 2026, 1 a.m.
Created at: April 8, 2026, 9:15 p.m.