Triple

T10748436
Position Surface form Disambiguated ID Type / Status
Subject Camp 4 campground E253511 entity
Predicate instanceOf P0 FINISHED
Object rock climbers’ campground C17974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rock climbers’ campground
Context triple: [Camp 4 campground, instanceOf, rock climbers’ campground]
  • A. rock climbing area
    A rock climbing area is a designated natural or artificial location equipped with routes and features suitable for climbing activities.
  • B. alpine climbing area
    An alpine climbing area is a high-altitude mountain environment offering established routes on rock, snow, and ice, typically requiring technical gear, route-finding skills, and awareness of rapidly changing weather and objective hazards.
  • C. mountaineering base camp
    A mountaineering base camp is a temporary, strategically located encampment that serves as the primary logistical, acclimatization, and staging point for climbers attempting high-altitude ascents.
  • D. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • E. campsite chosen
    A campsite is a designated outdoor area equipped for temporary living, where people can pitch tents or park recreational vehicles and access basic facilities such as fire pits, water, and restrooms.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5e51e8819095f06881cecf152e completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:15 p.m.