Triple
T10746986
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Altenwerder container terminal |
E253474
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | maritime cargo terminal |
C28493
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: maritime cargo terminal Context triple: [Altenwerder container terminal, instanceOf, maritime cargo terminal]
-
A.
coal terminal
A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
-
B.
maritime warehouse
A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
-
C.
grain terminal
A grain terminal is a large-scale facility designed for the receipt, storage, handling, and transfer of bulk grains between transportation modes such as trucks, railcars, and ships.
-
D.
port crane
A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
-
E.
ferry terminal
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5e51e8819095f06881cecf152e |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:15 p.m.