Triple
T10746806
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scarborough seafront |
E253469
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal promenade |
C6461
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal promenade Context triple: [Scarborough seafront, instanceOf, coastal promenade]
-
A.
urban promenade
chosen
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
B.
public beach
A public beach is a coastal area owned and maintained by a government or community, freely accessible to the general public for recreation, relaxation, and shoreline activities.
-
C.
beachfront park
A beachfront park is a public recreational area located along a shoreline that combines natural coastal features with amenities such as walking paths, picnic areas, and playgrounds for leisure and outdoor activities.
-
D.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
E.
beach area
A beach area is a coastal zone where land meets a body of water, typically featuring sand or pebbles and used for recreation, relaxation, and shoreline activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5e51e8819095f06881cecf152e |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:15 p.m.