Triple
T10743563
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Skywalk lookout |
E253388
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevated viewing platform |
C12583
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevated viewing platform Context triple: [Skywalk lookout, instanceOf, elevated viewing platform]
-
A.
elevated walkway
An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
-
B.
ceremonial platform
A ceremonial platform is an elevated, often architecturally distinct structure designed as the focal stage for formal rituals, public rites, or symbolic performances.
-
C.
observation deck
An observation deck is an elevated platform, often atop a tall building or structure, designed to provide visitors with expansive views of the surrounding area.
-
D.
viewing platform
chosen
A viewing platform is an elevated, often open structure designed to provide people with a safe, unobstructed vantage point for observing the surrounding environment or specific points of interest.
-
E.
passenger railway platform
A passenger railway platform is a designated area alongside railway tracks where passengers safely board and alight from trains.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5e51e8819095f06881cecf152e |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:15 p.m.