Triple
T10742355
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Espai Barça project |
E253358
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | FC Barcelona infrastructure project |
C28481
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: FC Barcelona infrastructure project Context triple: [Espai Barça project, instanceOf, FC Barcelona infrastructure project]
-
A.
Count of Barcelona
The Count of Barcelona was a medieval noble title and ruler of the County of Barcelona, a key political and territorial entity in northeastern Iberia that later formed the core of the Crown of Aragon.
-
B.
museum in Barcelona
A museum in Barcelona is a cultural institution that collects, preserves, and exhibits art, history, or science artifacts within the city, often highlighting Catalan and Spanish heritage.
-
C.
FIFA initiative
A FIFA initiative is an organized program or project launched by FIFA to develop, regulate, or promote football globally in areas such as governance, infrastructure, competitions, or social impact.
-
D.
Madrid Metro station
A Madrid Metro station is a designated underground or surface facility where passengers access, board, and transfer between trains on the Madrid Metro network.
-
E.
barrio of Madrid
A barrio of Madrid is a distinct urban neighborhood within the city, characterized by its own local identity, social life, and built environment while functioning as part of the broader municipal structure.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5e51e8819095f06881cecf152e |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:15 p.m.