Triple

T10742354
Position Surface form Disambiguated ID Type / Status
Subject Espai Barça project E253358 entity
Predicate instanceOf P0 FINISHED
Object stadium modernization project C28480 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stadium modernization project
Context triple: [Espai Barça project, instanceOf, stadium modernization project]
  • A. stadium infrastructure standard
    A stadium infrastructure standard defines the technical, safety, accessibility, and operational requirements that stadium facilities must meet to ensure consistent quality, performance, and compliance across venues.
  • B. multi-purpose stadium
    A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
  • C. sport venue
    A sport venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
  • D. railway modernisation project
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • E. sports venue
    A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5e51e8819095f06881cecf152e completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:15 p.m.