Triple
T10742354
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Espai Barça project |
E253358
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stadium modernization project |
C28480
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stadium modernization project Context triple: [Espai Barça project, instanceOf, stadium modernization project]
-
A.
stadium infrastructure standard
A stadium infrastructure standard defines the technical, safety, accessibility, and operational requirements that stadium facilities must meet to ensure consistent quality, performance, and compliance across venues.
-
B.
multi-purpose stadium
A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
-
C.
sport venue
A sport venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
-
D.
railway modernisation project
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
E.
sports venue
A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5e51e8819095f06881cecf152e |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:15 p.m.