Triple

T10729786
Position Surface form Disambiguated ID Type / Status
Subject Eagle Tower E253041 entity
Predicate instanceOf P0 FINISHED
Object castle tower C5026 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: castle tower
Context triple: [Eagle Tower, instanceOf, castle tower]
  • A. castle gate
    A castle gate is a fortified main entrance to a castle, typically consisting of heavy doors, portcullises, and defensive structures designed to control access and resist attack.
  • B. fortified tower chosen
    A fortified tower is a tall, strongly built defensive structure designed to provide elevated surveillance, protection, and control over the surrounding area.
  • C. Gothic tower
    A Gothic tower is a tall, slender architectural structure characterized by pointed arches, intricate stone tracery, and vertical emphasis that evokes a sense of height and drama.
  • D. castle name
    A castle name is a distinctive title or designation given to a castle that often reflects its location, history, ownership, or symbolic significance.
  • E. leaning tower
    A leaning tower is a tall, typically cylindrical structure whose vertical axis is visibly tilted from true vertical, often due to unstable foundations or ground subsidence.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5d8be481909a43218b2bfdbe95 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:14 p.m.