Triple

T10720744
Position Surface form Disambiguated ID Type / Status
Subject Millennium Gate (Vancouver Chinatown) E252812 entity
Predicate instanceOf P0 FINISHED
Object ceremonial archway C2172 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ceremonial archway
Context triple: [Millennium Gate (Vancouver Chinatown), instanceOf, ceremonial archway]
  • A. triumphal arch chosen
    A triumphal arch is a monumental, freestanding structure with one or more arched passageways, built to commemorate significant victories, events, or individuals.
  • B. ceremonial bridge
    A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
  • C. ceremonial corridor
    A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
  • D. monumental sculptural portal
    A monumental sculptural portal is a grand architectural entrance framed and embellished by large-scale sculptural elements that convey symbolic, ceremonial, or commemorative significance.
  • E. entrance gate
    An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5d8be481909a43218b2bfdbe95 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:13 p.m.