Triple

T10718709
Position Surface form Disambiguated ID Type / Status
Subject Dreamers E252757 entity
Predicate instanceOf P0 FINISHED
Object component of Liberation C28666 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: component of Liberation
Context triple: [Dreamers, instanceOf, component of Liberation]
  • A. path to liberation
    A path to liberation is a transformative process or journey through which individuals progressively free themselves from constraints—whether psychological, social, or spiritual—to realize a state of authentic autonomy and inner freedom.
  • B. component of peace accords
    A component of peace accords is a distinct provision or mechanism within a negotiated agreement that addresses specific issues—such as security, governance, justice, or reconstruction—to facilitate the resolution of conflict and the establishment of sustainable peace.
  • C. national liberation leader
    A national liberation leader is an individual who organizes, inspires, and directs a collective struggle to free a nation or people from colonial rule, occupation, or systemic oppression, often combining political vision with strategic mobilization.
  • D. Freedom Rider
    A Freedom Rider is an individual who participated in the civil rights movement by riding interstate buses into segregated Southern states to challenge and protest racial segregation in the early 1960s.
  • E. resistance fighter
    A resistance fighter is an individual who actively opposes and combats an occupying force, oppressive regime, or unjust authority, often through clandestine, guerrilla, or subversive means.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5d8be481909a43218b2bfdbe95 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:13 p.m.