Triple

T10694044
Position Surface form Disambiguated ID Type / Status
Subject Liverpool Waters E252085 entity
Predicate instanceOf P0 FINISHED
Object waterfront regeneration scheme C10710 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: waterfront regeneration scheme
Context triple: [Liverpool Waters, instanceOf, waterfront regeneration scheme]
  • A. waterfront revitalization plan chosen
    A waterfront revitalization plan is a comprehensive strategy to transform underused or deteriorated shoreline areas into vibrant, accessible, and sustainable public and economic spaces.
  • B. waterfront development site
    A waterfront development site is a designated parcel of land adjacent to a body of water that is planned or suitable for construction and mixed-use projects leveraging water access and views.
  • C. waterfront site
    A waterfront site is a parcel of land directly adjacent to a body of water, whose location, access, and environmental conditions are fundamentally shaped by its shoreline interface.
  • D. waterfront hub
    A waterfront hub is a central, mixed-use area located along a body of water that concentrates transportation, commerce, recreation, and social activities to connect people with the waterfront.
  • E. waterfront public space
    A waterfront public space is a shared, accessible area along a body of water designed for recreation, social interaction, and enjoyment of the natural and urban waterfront environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5bd7c08190a816e733b4045c23 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:11 p.m.