Triple
T10691065
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Riachuelo River |
E252007
|
entity |
| Predicate | governedByPlan |
P44469
|
FINISHED |
| Object |
Riachuelo Basin Integrated Cleanup Plan
The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
|
E879301
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Riachuelo Basin Integrated Cleanup Plan | Statement: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Riachuelo Basin Integrated Cleanup Plan Context triple: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
-
A.
Financial Fund for the Development of the River Plate Basin
The Financial Fund for the Development of the River Plate Basin (FONPLATA) is a multilateral development bank that finances infrastructure and integration projects to promote economic and social development among its member countries in the River Plate Basin region.
-
B.
Basin Plan 2012
Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
-
C.
Mapocho Urbano Limpio project
The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
-
D.
Rhine Action Programme
The Rhine Action Programme is an international environmental initiative launched by Rhine-bordering countries to restore the river’s ecological health, improve water quality, and protect its ecosystems.
-
E.
Manila Bay rehabilitation program
The Manila Bay rehabilitation program is a Philippine government-led environmental initiative aimed at restoring the bay’s water quality, coastal ecosystems, and overall ecological health through cleanup, pollution control, and habitat restoration measures.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Riachuelo Basin Integrated Cleanup Plan Triple: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
Generated description
The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Riachuelo Basin Integrated Cleanup Plan Target entity description: The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
-
A.
Financial Fund for the Development of the River Plate Basin
The Financial Fund for the Development of the River Plate Basin (FONPLATA) is a multilateral development bank that finances infrastructure and integration projects to promote economic and social development among its member countries in the River Plate Basin region.
-
B.
Basin Plan 2012
Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
-
C.
Mapocho Urbano Limpio project
The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
-
D.
Rhine Action Programme
The Rhine Action Programme is an international environmental initiative launched by Rhine-bordering countries to restore the river’s ecological health, improve water quality, and protect its ecosystems.
-
E.
Manila Bay rehabilitation program
The Manila Bay rehabilitation program is a Philippine government-led environmental initiative aimed at restoring the bay’s water quality, coastal ecosystems, and overall ecological health through cleanup, pollution control, and habitat restoration measures.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5bd7c08190a816e733b4045c23 |
completed | April 8, 2026, 7:19 p.m. |
| NER | Named-entity recognition | batch_69d6fd3705788190bcbdef93b4c5f574 |
completed | April 9, 2026, 1:13 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d988a59d6c8190a0e170acfb3af6da |
completed | April 10, 2026, 11:32 p.m. |
| NEDg | Description generation | batch_69d98aeb82988190a17b009c74279423 |
completed | April 10, 2026, 11:42 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69d98c2aae048190b348e5614ff23f03 |
completed | April 10, 2026, 11:47 p.m. |
Created at: April 8, 2026, 9:11 p.m.