Triple

T10691065
Position Surface form Disambiguated ID Type / Status
Subject Riachuelo River E252007 entity
Predicate governedByPlan P44469 FINISHED
Object Riachuelo Basin Integrated Cleanup Plan
The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
E879301 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Riachuelo Basin Integrated Cleanup Plan | Statement: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Riachuelo Basin Integrated Cleanup Plan
Context triple: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
  • A. Financial Fund for the Development of the River Plate Basin
    The Financial Fund for the Development of the River Plate Basin (FONPLATA) is a multilateral development bank that finances infrastructure and integration projects to promote economic and social development among its member countries in the River Plate Basin region.
  • B. Basin Plan 2012
    Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
  • C. Mapocho Urbano Limpio project
    The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
  • D. Rhine Action Programme
    The Rhine Action Programme is an international environmental initiative launched by Rhine-bordering countries to restore the river’s ecological health, improve water quality, and protect its ecosystems.
  • E. Manila Bay rehabilitation program
    The Manila Bay rehabilitation program is a Philippine government-led environmental initiative aimed at restoring the bay’s water quality, coastal ecosystems, and overall ecological health through cleanup, pollution control, and habitat restoration measures.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Riachuelo Basin Integrated Cleanup Plan
Triple: [Riachuelo River, governedByPlan, Riachuelo Basin Integrated Cleanup Plan]
Generated description
The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Riachuelo Basin Integrated Cleanup Plan
Target entity description: The Riachuelo Basin Integrated Cleanup Plan is a comprehensive environmental and infrastructure program aimed at remediating pollution, restoring ecosystems, and improving living conditions in the heavily contaminated Riachuelo River basin in Argentina.
  • A. Financial Fund for the Development of the River Plate Basin
    The Financial Fund for the Development of the River Plate Basin (FONPLATA) is a multilateral development bank that finances infrastructure and integration projects to promote economic and social development among its member countries in the River Plate Basin region.
  • B. Basin Plan 2012
    Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
  • C. Mapocho Urbano Limpio project
    The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
  • D. Rhine Action Programme
    The Rhine Action Programme is an international environmental initiative launched by Rhine-bordering countries to restore the river’s ecological health, improve water quality, and protect its ecosystems.
  • E. Manila Bay rehabilitation program
    The Manila Bay rehabilitation program is a Philippine government-led environmental initiative aimed at restoring the bay’s water quality, coastal ecosystems, and overall ecological health through cleanup, pollution control, and habitat restoration measures.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5bd7c08190a816e733b4045c23 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6fd3705788190bcbdef93b4c5f574 completed April 9, 2026, 1:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69d988a59d6c8190a0e170acfb3af6da completed April 10, 2026, 11:32 p.m.
NEDg Description generation batch_69d98aeb82988190a17b009c74279423 completed April 10, 2026, 11:42 p.m.
NED2 Entity disambiguation (via description) batch_69d98c2aae048190b348e5614ff23f03 completed April 10, 2026, 11:47 p.m.
Created at: April 8, 2026, 9:11 p.m.