Triple
T10674703
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | In the Labyrinth |
E251585
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-screen film |
C684
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-screen film Context triple: [In the Labyrinth, instanceOf, multi-screen film]
-
A.
large-format motion picture film system
A large-format motion picture film system is a high-resolution cinematic technology that uses wider or taller film stock and specialized cameras and projectors to capture and display images with greater detail, clarity, and immersive scale than standard film formats.
-
B.
single-screen theater
A single-screen theater is a movie venue that features only one auditorium, showing one film at a time to all its patrons.
-
C.
cinema
A cinema is a venue equipped with large screens, projection and sound systems, where audiences gather to watch films in a shared, theatrical setting.
-
D.
film
chosen
A film is a recorded sequence of moving images, often combined with sound, created to tell stories, document events, or convey artistic expression for viewing by an audience.
-
E.
film release
A film release is the coordinated distribution and public debut of a movie to audiences through theaters, streaming platforms, or other media channels on a specified date.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5b0d2881909584b20efc5877f0 |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:09 p.m.