Triple

T10674215
Position Surface form Disambiguated ID Type / Status
Subject I-94 E251570 entity
Predicate hasAuxiliaryRoute P6117 FINISHED
Object I-894 (Wisconsin)
I-894 is a bypass auxiliary Interstate Highway in the Milwaukee, Wisconsin area that helps route traffic around the city’s downtown core.
E880047 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-894 (Wisconsin) | Statement: [I-94, hasAuxiliaryRoute, I-894 (Wisconsin)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-894 (Wisconsin)
Context triple: [I-94, hasAuxiliaryRoute, I-894 (Wisconsin)]
  • A. I-794 (Wisconsin)
    I-794 (Wisconsin) is an auxiliary Interstate highway in Milwaukee that connects downtown to the Lake Freeway and the Lake Michigan lakefront.
  • B. I-194 (Michigan)
    I-194 (Michigan) is a short auxiliary Interstate highway in Battle Creek that connects downtown with I-94.
  • C. I-390
    I-390 is a toll highway in northeastern Illinois that serves as a major east–west connector in the Chicago metropolitan area.
  • D. I-8
    I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
  • E. Wisconsin Highway 100
    Wisconsin Highway 100 is a major state highway encircling much of the Milwaukee metropolitan area, serving as a key arterial route for suburban traffic and commercial access.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: I-894 (Wisconsin)
Triple: [I-94, hasAuxiliaryRoute, I-894 (Wisconsin)]
Generated description
I-894 is a bypass auxiliary Interstate Highway in the Milwaukee, Wisconsin area that helps route traffic around the city’s downtown core.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-894 (Wisconsin)
Target entity description: I-894 is a bypass auxiliary Interstate Highway in the Milwaukee, Wisconsin area that helps route traffic around the city’s downtown core.
  • A. I-794 (Wisconsin)
    I-794 (Wisconsin) is an auxiliary Interstate highway in Milwaukee that connects downtown to the Lake Freeway and the Lake Michigan lakefront.
  • B. I-194 (Michigan)
    I-194 (Michigan) is a short auxiliary Interstate highway in Battle Creek that connects downtown with I-94.
  • C. I-390
    I-390 is a toll highway in northeastern Illinois that serves as a major east–west connector in the Chicago metropolitan area.
  • D. I-8
    I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
  • E. Wisconsin Highway 100
    Wisconsin Highway 100 is a major state highway encircling much of the Milwaukee metropolitan area, serving as a key arterial route for suburban traffic and commercial access.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5b0d2881909584b20efc5877f0 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6fb9299708190a0a3818f2e4e9bf5 completed April 9, 2026, 1:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69d998bfc27c8190a9d3e77fbe544a6d completed April 11, 2026, 12:41 a.m.
NEDg Description generation batch_69d99e8312188190bec3090f34a7b9b9 completed April 11, 2026, 1:06 a.m.
NED2 Entity disambiguation (via description) batch_69d99f50e0888190b8e7b2547e1526af completed April 11, 2026, 1:09 a.m.
Created at: April 8, 2026, 9:09 p.m.