Triple

T10674197
Position Surface form Disambiguated ID Type / Status
Subject I-94 E251570 entity
Predicate hasJunctionWith P1018 FINISHED
Object I-29 E7549 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-29 | Statement: [I-94, hasJunctionWith, I-29]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-29
Context triple: [I-94, hasJunctionWith, I-29]
  • A. Interstate 29 chosen
    Interstate 29 is a major north–south U.S. highway running through the Great Plains from Missouri to North Dakota, connecting cities such as Kansas City, Sioux City, and Fargo.
  • B. Interstate 293
    Interstate 293 is a short auxiliary Interstate highway that forms a partial beltway around Manchester, New Hampshire, connecting Interstate 93 with other major routes in the area.
  • C. I-294
    I-294 is a major tollway in the Chicago metropolitan area that forms part of the Tri-State Tollway system, carrying heavy regional and interstate traffic around the city.
  • D. Interstate 27
    Interstate 27 is a north–south U.S. Interstate Highway in Texas that connects the cities of Lubbock and Amarillo, serving as a key corridor through the Texas Panhandle and South Plains.
  • E. Interstate 8
    Interstate 8 is a major east–west U.S. Interstate Highway running from San Diego, California, to the Arizona border near Yuma, serving as a key route across the southernmost part of the Southwest.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5b0d2881909584b20efc5877f0 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6fb9299708190a0a3818f2e4e9bf5 completed April 9, 2026, 1:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1330527481908d518093debc9ad1 completed May 9, 2026, 10:57 a.m.
Created at: April 8, 2026, 9:09 p.m.