Triple
T10671067
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kai (quay) |
E251485
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterside embankment |
C12933
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterside embankment Context triple: [Kai (quay), instanceOf, waterside embankment]
-
A.
embankment section
chosen
An embankment section is a cross-sectional representation of a raised earth or engineered structure built to support or protect infrastructure such as roads, railways, or flood defenses.
-
B.
waterfront hub
A waterfront hub is a central, mixed-use area located along a body of water that concentrates transportation, commerce, recreation, and social activities to connect people with the waterfront.
-
C.
bridge over the River Trent
A bridge over the River Trent is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods across the waterway.
-
D.
canal wharf
A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
-
E.
waterfront street
A waterfront street is a public roadway or pedestrian thoroughfare that runs directly alongside a body of water, often featuring views, access points, and amenities oriented toward the shoreline.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5b0d2881909584b20efc5877f0 |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:09 p.m.