Triple

T10667217
Position Surface form Disambiguated ID Type / Status
Subject Snoqualmie River E251385 entity
Predicate crossedBy P416 FINISHED
Object State Route 202 E838200 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 202 | Statement: [Snoqualmie River, crossedBy, State Route 202]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 202
Context triple: [Snoqualmie River, crossedBy, State Route 202]
  • A. State Route 202 chosen
    State Route 202 is a state highway that serves as a regional connector route within its state's road network.
  • B. State Route 20
    State Route 20 is a major Washington State highway that spans the North Cascades, serving as a key east–west route for travel, commerce, and tourism.
  • C. State Route 20
    State Route 20 is a major east–west state highway in Northern California that connects the North Coast region to the Sacramento Valley and the Sierra Nevada.
  • D. State Route 20
    State Route 20 is a significant east–west state highway in Georgia that connects multiple communities across the Atlanta metropolitan area and beyond.
  • E. State Route 242
    State Route 242 is a short California state highway in Contra Costa County that connects Interstate 680 with State Route 4, serving as a key commuter corridor in the East Bay.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5b0d2881909584b20efc5877f0 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6f3204bac8190b9bd8bfcc705b06b completed April 9, 2026, 12:30 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7b8bcbb34819088c21d79357eef8a completed May 3, 2026, 9:06 p.m.
Created at: April 8, 2026, 9:08 p.m.