Triple

T10657995
Position Surface form Disambiguated ID Type / Status
Subject Koyna Dam E251145 entity
Predicate crosses P416 FINISHED
Object Koyna River E403127 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Koyna River | Statement: [Koyna Dam, crosses, Koyna River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Koyna River
Context triple: [Koyna Dam, crosses, Koyna River]
  • A. Koyna River chosen
    The Koyna River is a major river in western India known for the Koyna Dam and its significant role in hydroelectric power generation in Maharashtra.
  • B. Kabini River
    Kabini River is a major tributary of the Kaveri River in southern India, known for its rich wildlife habitats and the scenic Kabini Reservoir.
  • C. Gurupura River
    The Gurupura River is a significant waterway in the Indian state of Karnataka that flows through and alongside the coastal city of Mangalore before joining the Arabian Sea.
  • D. Kolar River
    The Kolar River is a significant tributary of central India’s Narmada River, contributing to the region’s water resources and irrigation.
  • E. Ghataprabha River
    The Ghataprabha River is a significant river in southern India that flows through Karnataka and Maharashtra, supporting irrigation, agriculture, and hydroelectric projects before joining the Krishna River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5a4c4881908f39be6efe5981e5 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6e01643a88190abc7c16fd0f85e53 completed April 8, 2026, 11:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f62d41448190ab65fb9c81d4d673 completed May 2, 2026, 1:03 p.m.
Created at: April 8, 2026, 9:07 p.m.