Triple

T10640226
Position Surface form Disambiguated ID Type / Status
Subject D2 E250700 entity
Predicate instanceOf P0 FINISHED
Object line of the Moscow Central Diameters C74 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: line of the Moscow Central Diameters
Context triple: [D2, instanceOf, line of the Moscow Central Diameters]
  • A. Moscow Metro depot
    A Moscow Metro depot is a specialized facility where metro trains are stored, inspected, maintained, and repaired to ensure reliable operation of the Moscow subway system.
  • B. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • C. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • D. group of rapid transit lines
    A group of rapid transit lines is a collection of interconnected high-capacity urban rail or metro routes that operate together as a coordinated network to provide frequent, efficient public transportation.
  • E. commuter rail line chosen
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5a4c4881908f39be6efe5981e5 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:04 p.m.