Triple

T10637721
Position Surface form Disambiguated ID Type / Status
Subject Green Line trunk subway E250636 entity
Predicate instanceOf P0 FINISHED
Object subway line segment C2488 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: subway line segment
Context triple: [Green Line trunk subway, instanceOf, subway line segment]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. public transit line segment
    A public transit line segment is a contiguous portion of a transit route between two consecutive stops or stations, characterized by its path, travel time, and operational attributes.
  • C. rapid transit line segment chosen
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • D. subway line extension
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • E. tram line
    A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5993448190a493b790b8f85010 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:04 p.m.