Triple

T10636598
Position Surface form Disambiguated ID Type / Status
Subject Nanjing Performing Arts Center (design) E250596 entity
Predicate instanceOf P0 FINISHED
Object conceptual architectural project C3256 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: conceptual architectural project
Context triple: [Nanjing Performing Arts Center (design), instanceOf, conceptual architectural project]
  • A. architectural consulting project
    An architectural consulting project is a professional engagement in which architects analyze client needs, evaluate existing conditions, and develop strategic design recommendations, plans, and guidance to inform and optimize building or spatial development decisions.
  • B. architectural design chosen
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • C. architectural project involvement
    Architectural project involvement is the coordinated participation of stakeholders, professionals, and resources throughout the planning, design, and execution phases of an architectural endeavor.
  • D. architectural work
    An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
  • E. architectural project portfolio
    An architectural project portfolio is a curated collection of an architect’s or firm’s design works, showcasing project concepts, processes, visuals, and outcomes to demonstrate skills, style, and professional capabilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5993448190a493b790b8f85010 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:04 p.m.