Triple
T10635912
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dames Point Marine Terminal |
E250579
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | deepwater port facility |
C452
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: deepwater port facility Context triple: [Dames Point Marine Terminal, instanceOf, deepwater port facility]
-
A.
former port facility
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
B.
dry dock
A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
-
C.
seaport
chosen
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
D.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
-
E.
port crane
A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5993448190a493b790b8f85010 |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 9:03 p.m.