Triple

T10633963
Position Surface form Disambiguated ID Type / Status
Subject Coosa River E250529 entity
Predicate hasReservoir P1025 FINISHED
Object Jordan Lake E628427 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jordan Lake | Statement: [Coosa River, hasReservoir, Jordan Lake]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jordan Lake
Context triple: [Coosa River, hasReservoir, Jordan Lake]
  • A. Jordan Lake
    Jordan Lake is a large man-made reservoir in central North Carolina known for recreation, wildlife habitat, and regional water supply and flood control.
  • B. Jordan Lake chosen
    Jordan Lake is a man-made reservoir in Elmore County, Alabama, used primarily for hydroelectric power generation, recreation, and water management.
  • C. Johnson Lake
    Johnson Lake is a high-elevation alpine lake in Nevada’s South Snake Range, known for its scenic mountain setting and backcountry hiking access.
  • D. High Rock Lake
    High Rock Lake is a large reservoir in central North Carolina popular for boating, fishing, and recreational activities.
  • E. Hiwassee Lake
    Hiwassee Lake is a man-made reservoir in western North Carolina known for its scenic mountain setting, recreational boating and fishing, and role in regional hydroelectric power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5993448190a493b790b8f85010 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6dfab47bc819086684edc1b6dce74 completed April 8, 2026, 11:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69d97a3e0e1481909c277be4c12b46ea completed April 10, 2026, 10:31 p.m.
Created at: April 8, 2026, 9:02 p.m.