Triple
T10633963
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coosa River |
E250529
|
entity |
| Predicate | hasReservoir |
P1025
|
FINISHED |
| Object | Jordan Lake |
E628427
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jordan Lake | Statement: [Coosa River, hasReservoir, Jordan Lake]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Jordan Lake Context triple: [Coosa River, hasReservoir, Jordan Lake]
-
A.
Jordan Lake
Jordan Lake is a large man-made reservoir in central North Carolina known for recreation, wildlife habitat, and regional water supply and flood control.
-
B.
Jordan Lake
chosen
Jordan Lake is a man-made reservoir in Elmore County, Alabama, used primarily for hydroelectric power generation, recreation, and water management.
-
C.
Johnson Lake
Johnson Lake is a high-elevation alpine lake in Nevada’s South Snake Range, known for its scenic mountain setting and backcountry hiking access.
-
D.
High Rock Lake
High Rock Lake is a large reservoir in central North Carolina popular for boating, fishing, and recreational activities.
-
E.
Hiwassee Lake
Hiwassee Lake is a man-made reservoir in western North Carolina known for its scenic mountain setting, recreational boating and fishing, and role in regional hydroelectric power generation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5993448190a493b790b8f85010 |
completed | April 8, 2026, 7:19 p.m. |
| NER | Named-entity recognition | batch_69d6dfab47bc819086684edc1b6dce74 |
completed | April 8, 2026, 11:07 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d97a3e0e1481909c277be4c12b46ea |
completed | April 10, 2026, 10:31 p.m. |
Created at: April 8, 2026, 9:02 p.m.