Triple
T10633952
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coosa River |
E250529
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Weiss Dam |
E686354
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Weiss Dam | Statement: [Coosa River, hasDam, Weiss Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Weiss Dam Context triple: [Coosa River, hasDam, Weiss Dam]
-
A.
Weiss Dam
chosen
Weiss Dam is a hydroelectric dam on the Coosa River in northeastern Alabama that impounds Weiss Lake for power generation, flood control, and recreation.
-
B.
Pardee Dam
Pardee Dam is a concrete arch dam in California that forms Pardee Reservoir, providing water storage, hydroelectric power, and flood control for the Mokelumne River system.
-
C.
Merwin Dam
Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
-
D.
Keechelus Dam
Keechelus Dam is an earthfill dam in Washington State that forms Keechelus Lake, providing water storage and regulation as part of the U.S. Bureau of Reclamation’s Yakima irrigation system.
-
E.
McClure Dam
McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5993448190a493b790b8f85010 |
completed | April 8, 2026, 7:19 p.m. |
| NER | Named-entity recognition | batch_69d6dfab47bc819086684edc1b6dce74 |
completed | April 8, 2026, 11:07 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e4f31e3d5c8190a044eaf67ebc9f08 |
completed | April 19, 2026, 3:22 p.m. |
Created at: April 8, 2026, 9:02 p.m.