Triple
T1062396
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tampa Riverwalk |
E22935
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian walkway |
C6047
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian walkway Context triple: [Tampa Riverwalk, instanceOf, pedestrian walkway]
-
A.
elevated walkway
An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
-
B.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
C.
wooden walkway
A wooden walkway is an elevated or ground-level path constructed from timber planks, designed to provide a stable, durable walking surface over terrain such as sand, wetlands, or landscaped areas.
-
D.
covered walkway
A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
-
E.
pedestrian skybridge
A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493dada0481909c43649f9843ea91 |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:42 p.m.