Triple
T10623476
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Serpent Mound |
E250262
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | effigy mound |
C1486
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: effigy mound Context triple: [Serpent Mound, instanceOf, effigy mound]
-
A.
Hopewell culture earthwork
A Hopewell culture earthwork is a large, geometric or effigy-shaped earthen construction built by the Middle Woodland Hopewell peoples for ceremonial, social, and mortuary purposes in eastern North America.
-
B.
pyramid-shaped monument
A pyramid-shaped monument is a large, often stone-built, commemorative structure with a polygonal base and triangular sides that converge to a single apex, typically serving religious, funerary, or memorial purposes.
-
C.
geoglyphs
chosen
Geoglyphs are large-scale designs or motifs created on the ground, typically by arranging or removing natural materials, so they are best viewed from an elevated perspective.
-
D.
stone monument
A stone monument is a durable, often large-scale structure carved or assembled from stone to commemorate people, events, beliefs, or cultural values.
-
E.
ceremonial monument
A ceremonial monument is a constructed structure or site designed to commemorate significant events, individuals, or cultural beliefs through formal or ritualized practices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa5993448190a493b790b8f85010 |
completed | April 8, 2026, 7:19 p.m. |
Created at: April 8, 2026, 8:52 p.m.