Triple

T10606192
Position Surface form Disambiguated ID Type / Status
Subject Shravan month E275882 entity
Predicate instanceOf P0 FINISHED
Object month in the Hindu calendar C5362 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: month in the Hindu calendar
Context triple: [Shravan month, instanceOf, month in the Hindu calendar]
  • A. Islamic month
    An Islamic month is one of the twelve lunar-based divisions of the Islamic calendar, beginning with the sighting of the new moon and used to determine religious observances and events in Islam.
  • B. time period in the Jewish calendar
    A time period in the Jewish calendar is a defined span of time—such as a day, week, month, festival, or year—structured according to Jewish religious law and tradition for ritual, historical, and communal purposes.
  • C. religious month chosen
    A religious month is a designated period in a calendar that holds special spiritual, ritual, or commemorative significance within a particular faith tradition.
  • D. lunisolar calendar
    A lunisolar calendar is a dating system that combines lunar months with periodic adjustments to align with the solar year, ensuring that months track the moon’s phases while years remain synchronized with the seasons.
  • E. solar calendar
    A solar calendar is a timekeeping system in which dates are based on the Earth's position in its orbit around the Sun, typically approximating the length of the tropical year.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf948d88190806cc3a8c47a3fb2 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 7:32 p.m.