Triple

T10600926
Position Surface form Disambiguated ID Type / Status
Subject Lune Millennium Bridge E275743 entity
Predicate partOf P40 FINISHED
Object Lancaster riverside regeneration
Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
E874038 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lancaster riverside regeneration | Statement: [Lune Millennium Bridge, partOf, Lancaster riverside regeneration]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lancaster riverside regeneration
Context triple: [Lune Millennium Bridge, partOf, Lancaster riverside regeneration]
  • A. Liverpool Waters regeneration scheme
    The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
  • B. Rochdale Riverside regeneration scheme
    The Rochdale Riverside regeneration scheme is a major urban redevelopment project in Rochdale, England, focused on revitalizing the town centre with new retail, leisure, and public spaces.
  • C. Royal Arsenal Riverside regeneration project
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • D. Thames Gateway regeneration area
    The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
  • E. Blatchford redevelopment project
    The Blatchford redevelopment project is a large-scale, sustainable urban community being built on the former Edmonton City Centre Airport lands in Edmonton, Alberta.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lancaster riverside regeneration
Triple: [Lune Millennium Bridge, partOf, Lancaster riverside regeneration]
Generated description
Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lancaster riverside regeneration
Target entity description: Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
  • A. Liverpool Waters regeneration scheme
    The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
  • B. Rochdale Riverside regeneration scheme
    The Rochdale Riverside regeneration scheme is a major urban redevelopment project in Rochdale, England, focused on revitalizing the town centre with new retail, leisure, and public spaces.
  • C. Royal Arsenal Riverside regeneration project
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • D. Thames Gateway regeneration area
    The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
  • E. Blatchford redevelopment project
    The Blatchford redevelopment project is a large-scale, sustainable urban community being built on the former Edmonton City Centre Airport lands in Edmonton, Alberta.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf948d88190806cc3a8c47a3fb2 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d6ded52f288190b40288d0acbe009b completed April 8, 2026, 11:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69d95ea8f1688190aa36e29b52667d26 completed April 10, 2026, 8:33 p.m.
NEDg Description generation batch_69d95f81955c8190b629d57a034a4b76 completed April 10, 2026, 8:37 p.m.
NED2 Entity disambiguation (via description) batch_69d961047a78819088094e02c0b99f60 completed April 10, 2026, 8:43 p.m.
Created at: April 8, 2026, 7:31 p.m.