Triple

T10586468
Position Surface form Disambiguated ID Type / Status
Subject Piscis Austrinus E249866 entity
Predicate borderedBy P224 FINISHED
Object Aquarius E247364 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Aquarius | Statement: [Piscis Austrinus, borderedBy, Aquarius]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Aquarius
Context triple: [Piscis Austrinus, borderedBy, Aquarius]
  • A. Aquarius
    Aquarius is a track featured on the album "Electric Circus" by Common.
  • B. Aquarius chosen
    Aquarius is a prominent zodiac constellation in the southern sky, traditionally depicted as a water-bearer pouring water.
  • C. Aquarius
    Aquarius is a sports drink brand owned by The Coca-Cola Company, popular in various international markets as a hydrating beverage for active consumers.
  • D. Pisces
    Pisces is a compassionate and intuitive water sign in the zodiac, often associated with creativity, empathy, and emotional depth.
  • E. Scorpio
    "Scorpio" is a 1973 Cold War spy thriller film directed by Michael Winner, starring Burt Lancaster and Alain Delon as rival assassins entangled in CIA intrigue.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c9d3d48190a29ee491e1696a0e completed April 6, 2026, 9:50 a.m.
NER Named-entity recognition batch_69d527698be48190a2f5e573d7cc0661 completed April 7, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69d97a1bba1c8190af5a078f40f3bc0a completed April 10, 2026, 10:30 p.m.
Created at: April 6, 2026, 12:39 p.m.